2024 – Q4 Gallery – Base Camp
2022 – Q2 Gallery
2022 – Q1 Gallery
2021 – Q4 Gallery
Stockpiled and ready
Stockpiled ore from the first vein intercepted in the development of the Antonino tunnel.
2021 – Q3 Gallery
Don Luis – 2
Chairman of the Board – Site Visit
La Fortuna Chimney
Antonino Tunnel – Construction
Competent Rock
The team finally reaches competent rock suitable for a tunnel entrance after clearing 25 meters.
Tunnel Entrance
Twenty-five meters into the mountainside the team creates the Antonino tunnel entrance.
Bless and Celebrate – 1
A special gift in preparation of blessing and celebrating the entrance of the Antonino tunnel.
Don Luis – 1
Extracted Ore
Director Italo Volante standing behind 54 tons of ore extracted from the Don Luis during Q4 2020 (various grades over 2 ounces of AU per ton.)
Las Dos Marias Project – Phase 1
Las Dos Marias Project – Due Diligence
The Merlin Target
Quartz crystalline-pyrite-chalcopyrite-sphalerite
Quartz crystalline-pyrite-chalcopyrite-sphalerite in Merlin veins.
The Fortuna Target
Old Mining Dumps
Old mining dumps at Fortuna mine. Main mining activity was from 1940 to 1970. Fortuna mine produced 289 Tn @ 92,29 g/t Au, 133,75 g/t Ag & 0,8 % Cu of concentrate.
Old Trench
Old Trench cutting structural corridor at Fortuna East and Central veins. In trench is possible to see argillic alteration halo (~30 meters width) and Quartz-hematite veins.
Old Trench
Old Trench cutting structural corridor at Fortuna East and Central veins. In trench is possible to see argillic alteration halo (~30 meters width) and Quartz-hematite veins.
The Pegaso Nero Target
The Lipangue Breccia Target
Oxidized outcrops
Oxidized outcrops of crackle hydrothermal breccias characterized by Quartz-hematite-jarosite matrix.
Oxidized outcrops
Oxidized outcrops of crackle hydrothermal breccias characterized by Quartz-hematite-jarosite matrix.
L14-20 drill hole, 86 meters
L14-20 drill hole, 86 meters: Quartz-chalcopyrite vein fragment in Magmatic-hydrothermal breccia.
L14-20 drill hole, 88-90 meters
L14-20 drill hole, 88-90 meters: Magmatic-hydrothermal breccia, Quartz-pyrite-chalcopyrite-chalcocite matrix.
L15-26 drill hole, 114 meters
L15-26 drill hole, 114 meters: Quartz-sericite veinlets with strong jarosite oxidation.
The Dos Marias Target
Sulfides replacement in Siltstones
Sulfides replacement in Siltstones. Pyrite-chalcopyrite-covellite replacement mineralization.
Sulfides replacement in Siltstones
Sulfides replacement in Siltstones. Pyrite-chalcopyrite-covellite replacement mineralization.
Andesitic porphyry intruding volcanoclastic sequences
Andesitic porphyry intruding volcanoclastic sequences. Quartz crystalline veinlets crosscutting, iron and copper oxides in outcrops.